Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Dec 02, 2023     FF2-3 Cowl Baffles step 7-9 - (2 hours) Category: Engine
Riveted the flanged duct. I had to replace ALL the rivets with -5 rivets as the Flange was bulging and removing the rivets resulted in enlarged holes. I am still not super happy with the result but i have not been able to have a better result.
 